Arkzip completed on Lidl Llanishen

Thursday 28th May 2015

At Eaves Rooling CardiffCompleted Arkzip

2700m2 of Aluminium Arkzip in RAL 9006 colour ARS was rolled on site at eaves level in 2 days. The twin skin standing seam roof involves sheets up to 30m long creating a roof with no exposed laps or fixings.

Leave a Reply